Zum Hauptinhalt springen
InvestGreen Mine 003, Paraguay
GM3 Technologies AGActive · 13% shares available

Green Mine 003, Paraguay

Our largest and most profitable facility. 6 MW, 100% hydropower, 279 investors, with 13% still available.

📍 Villarrica, Paraguay📅 December 2024 – ongoing
Production cost
~$54'015/BTC · 25–40% below market
Energy
100% hydropower · $0.057/kWh
Capacity
6 MW · 3.5 MW active
Share class
Same as the founders
Legal entity
GM3 Technologies AG · Zug
In operation since
28.12.2024

The facility that brings it all together.

GM3 isn't just larger than GM1 and GM2, it's the result of three years of learning under real conditions. 6 MW capacity, a direct hydropower contract in Paraguay at $0.057/kWh, latest-generation Bitmain S21 hardware (150 PH/s at 17 J/TH), and a fully operational SCADA system we built ourselves.

What makes GM3 special: the facility isn't just a Bitcoin producer. Excess heat at 70–80°C is redirected into drying chambers for fruit: mangoes, pineapples, papayas. This reduces effective energy costs and makes the operation less dependent on Bitcoin price.

279 investors hold shares in GM3 Technologies AG, the same share class as the founders. No preference rights, no debt, no overleveraging. Quarterly BTC distributions go directly to investor wallets.

What investors earned in 2025.

~26.7 BTC
BTC produced since go-live (28.12.2024)
14.5 BTC
BTC produced in 2025
+17.5%
EBIT margin
+10%
Avg. investor ROI 2025
+20%
Top ROI early investors
3.3 BTC
Total distributed 2025
0
Missed quarters in 2025

* Past performance is not an indicator of future results. 2025 was the first full operating year, at 50% capacity without active fruit drying. With 100% capacity and heat reuse active, target ROI for new investors is 10–20%.

13% of GM3 shares are still available.

87% of shares are already subscribed. You can invest directly: KYC, share subscription and payment are fully online.

Invest in GM3 now →
GM1GM2GM3