Zum Hauptinhalt springen
InvestGreen Mine 003, Paraguay
GM3 Technologies AGActive · 15% shares available

Green Mine 003, Paraguay

Our largest and most profitable facility. 6 MW, 100% hydropower, 264 investors, with 15% still available.

📍 Villarrica, Paraguay📅 December 2024 – ongoing
Location
Villarrica, Paraguay
Capacity
6 MW · 3.5 MW active
Hashrate · Efficiency
150 PH/s · 17 J/TH
Energy source
100% Hydropower
Go-live
28.12.2024
Status
Active · 15% available

The facility that brings it all together.

GM3 isn't just larger than GM1 and GM2, it's the result of three years of learning under real conditions. 6 MW capacity, a direct hydropower contract in Paraguay at $0.057/kWh, latest-generation Bitmain S21 hardware, and a fully operational SCADA system we built ourselves.

What makes GM3 special: the facility isn't just a Bitcoin producer. Excess heat at 70–80°C is redirected into drying chambers for fruit: mangoes, pineapples, papayas. This reduces effective energy costs and makes the operation less dependent on Bitcoin price.

264 investors hold shares in GM3 Technologies AG, the same share class as the founders. No preference rights, no debt, no overleveraging. Quarterly BTC distributions go directly to investor wallets.

What investors earned in 2025.

23.4 BTC
BTC produced (total, since go-live)
14.5 BTC
BTC produced 2025
+17.5%
EBIT margin
+10%
Avg. investor ROI 2025
+20%
Top ROI early investors
3.3 BTC
Total distributed 2025
0
Missed quarters

* Past performance is not an indicator of future results. 2025 was the first full operating year, at 50% capacity without active fruit drying. With 100% capacity and heat reuse active, target ROI for new investors is 10–20%.

15% of GM3 shares are still available.

85% of shares are already subscribed. You can invest directly: KYC, share subscription and payment are fully online.

Invest in GM3 now →
GM1GM2GM3